Llámennos
+39 02 80 29 21Envíenos un correo electrónico
logistics@dils.comPara obtener más información, complete el formulario a continuación y nos pondremos en contacto con usted.
The logistics warehouse spans approximately 60,000 square meters and offers highly efficient logistics solutions, featuring 54 loading bays to facilitate goods handling operations. Additionally, there are 23 dedicated parking spaces for heavy vehicles and 56 car parking spaces, along with a large parking area in front of the building, ensuring maximum convenience for staff and various operators involved.
With a clear height of 10.6 meters, the facility provides spacious and functional areas for storage.
Designed to ensure maximum flexibility, the structure can be adapted to specific operational requirements for both standard dry activities and temperature-controlled operations.
Sustainability is a key value of this project, with the goal of achieving LEED Gold certification, demonstrating a commitment to energy efficiency and environmental sustainability. Recently completed, the property represents a strategic opportunity for companies seeking modern, high-performance, and ready-to-use logistics solutions.
| Tipología | Big Box Logistics |
| Pre-certificación | Sí |
| Certificaciones | LEED Gold |
| Superficie de terreno | 197.000 m² |
| Superficie cubierta | 55.969 m² |
| Altura bajo viga | 11,00 m |
| Sistema de aspersión | NFPA ESFR |
| Bahías de carga | 54 |
| Puertas industriales | 4 |
| Cross-docking | Sí |
| Estructura REI | 120 |
| Capacidad de piso de carga | 5 t/m² |
| Accesos para vehículos | 1 |
| Plazas de aparcamiento | 151 |
| Plazas de aparcamiento para camiones | 23 |
| Autopistas | A4 - 5 km Conduciendo |
| Aeropuertos | Milan Bergamo - 14 km Conduciendo |